Undertank leak detection and subgrade protection to API 650 Annex I: the I.2 performance requirements, the leak barrier thickness and permeability (I.2 d, I.5.1), sand cover (I.5.4), perimeter drain pipes (I.5.5), double steel bottoms (I.4), sumps and detection wells, testing (I.6), and tanks supported by grillage with the I.7.3 spacing, bottom thickness and deflection
New here? Read the User Manual — the arrangements, each requirement, the grillage equations with a worked example.
◉ API 650 14TH ED. (AUGUST 2025) ANNEX I · FIGURES I.1 – I.11 · NOT A REGULATORY SUBMISSION TOOL
⚠ Indicative tool only. Follows API 650, 14th edition (August 2025), Annex I, checked against that text. Annex I is a requirement only when the Purchaser specifies one of its options or the whole annex; the owner decides whether leak detection is provided and which method (I.1.3). The units choose the printed values (1.1.3): 15 m / 800 µm / 100 mm in SI, 50 ft / 30 mils / 4 in. in US customary. Grillage members (AISC Chapter K), anchorage and shell buckling at the members are for the designer; this tool checks the bottom plate equations of I.7.3.
Unsaved inputs were found on this device.
Identification
Annex I prints each limit in both systems (1.1.3): the tool checks against the set you choose. Records are kept in SI.
Construction and Testing Record (I.2, I.5, I.6, I.7)
Tick each item once it is confirmed. Items that don’t apply are hidden.
Save & Report
Inputs are kept on this device as you type and offered back if the page is closed before saving. An API 650 Annex I release prevention barrier earns the 10-year credit of API 653 Table 6.1 (iv) in the Inspection Interval tool.