API 653 Section 9 · 5th edition, Addendum 4 (July 2025)

Repair Design Check — User Manual

Contents

    About this tool

    The Repair Design Check tests a repair or alteration to an existing tank against API 653 Section 9 (5th edition, 2014, Addendum 4, July 2025) before the work starts. Choose one of six repair types:

    • Shell plate replacement or insert (9.2) and door sheets (9.2.4): thickness, size, corner radius and the Figure 9.1 weld spacing.
    • Lapped patches on the shell (9.3): which of the three uses it is, its thickness by design with the joint efficiency 9.3 sets, the thickness limits, size and location.
    • New or replacement shell penetrations (9.9): the required shell thickness for the reinforcement area (9.9.2), stress relief (9.9.3), insert plates (9.9.6).
    • Welded-on bottom patches (9.11.1): inside and outside the critical zone.
    • Hot taps (9.15): Table 9.1, the extra limits for shell of unknown toughness, spacing, and the nozzle pressure test.
    Before the work, not instead of approval

    Every repair is approved before work starts by an authorized inspector or a storage tank engineer (9.1.3), on the basis of API 650 equivalence (9.1.1). The tool checks the limits Section 9 prints so the approval goes faster; it is an indicative check, not the approval.

    Quick start

    Choose a sample beside Summary of checks and press Load sample: each one is a repair on TK-101 (36 m × 13.8 m, G 0.9) that passes, so you can change one value at a time and watch the check that governs it.

    1. 1
      Identification: Tank ID and a repair item reference (the weld map number works well).
    2. 2
      Section 1: the repair type, D, the maximum liquid level, G and the height of the repair above the bottom (lowest point; centreline for a nozzle or hot tap). Then the shell: construction, toughness, material group, the course and its nominal thickness.
    3. 3
      Section 2 shows only the inputs for the repair you chose. Distances are toe to toe of the welds, as Section 9 measures them.
    4. 4
      Read the summary: each check names its clause. Tick the work record items as they are confirmed.
    5. 5
      Calculate & Save, then Print / PDF report. For a job with several items, save each under its own reference and print them together from the Tank Repair List.

    SI or US customary: two rule sets

    API 653 prints every limit twice, and the two are not exact conversions: 13 mm against 1/2 in. (12.7 mm), 300 mm against 12 in. (304.8 mm), 48 MPa against 7000 lbf/in.² (48.3 MPa). Like the Hydrostatic Test tool, the Repair Design Check uses the set you choose in Units and rule set, so the result matches the column of the standard you work to. Records are stored in SI either way.

    LimitSIUS customary
    Thin / thick shell plate13 mm1/2 in.
    Least replacement plate, A300 mm12 in.
    Lapped patch: smallest, largest5 mm, 13 mm3/16 in., 1/2 in.
    Critical zone; patch there at most75 mm; 6 mm3 in.; 1/4 in.
    Hot tap liquid head; stress, unknown toughness0.9 m; 48 MPa3 ft; 7000 lbf/in.²

    Replacement plates and door sheets (9.2)

    existing horizontal weldexisting vertical weldbottom · shell-to-bottom weld · bottom plate welds belowRHVBA (least dimension)plate to the bottomC: new vertical weld to a bottom plate weld
    The Figure 9.1 letters as the tool uses them.
    Lettert ≤ 13 mm (1/2 in.)t > 13 mm (1/2 in.)Sample, 22 mm
    R, corner radius150 mm (6 in.)greater of 150 mm (6 in.) or 6t150 mm
    B, to the shell-to-bottom weld150 mm (6 in.)greater of 250 mm (10 in.) or 8t250 mm
    H, to horizontal welds75 mm (3 in.)greater of 250 mm (10 in.) or 8t250 mm
    V, to vertical welds150 mm (6 in.)greater of 250 mm (10 in.) or 8t250 mm
    A, least plate dimension300 mm (12 in.)greater of 300 mm (12 in.) or 12t300 mm
    C, new vertical weld to bottom plate weldsgreater of 75 mm (3 in.) or 5tsame110 mm
    • t is the replacement plate thickness. 9.2.3.3 keys the same split on the existing plate, so if either plate is over 13 mm (1/2 in.) the tool uses the heavier column.
    • The plate is at least as thick as the thickest adjoining plate in the course, unless that plate is a thickened insert (9.2.1). Enter the thickness the as-built standard needs (from Shell Design, with the present G and level) to check it too.
    • When the plate crosses a horizontal seam, it extends past it by at least the greater of R and H. When it runs down to the shell-to-bottom joint at about 90°, B no longer applies and C does.
    • Radiography (12.2.1.6): circular plates at least one film; rectangular plates and door sheets one in a vertical joint, one in a horizontal joint and one at each corner; over 25 mm (1 in.) full length. The tool states the count for the Shell Radiograph Count checklist.
    • Door sheets: never across vertical riveted or lap-welded seams (9.2.4.5); in a lap-welded or riveted shell the original section may not go back across a horizontal seam (9.2.4.4), so a two-plate assembly of new plate is used (9.2.4.8); in a butt-welded shell a vertical offset is at least V (9.2.4.7), and without an offset the new welds and the crossed seam get extra MT or PT (9.2.4.6).

    Lapped patches on the shell (9.3)

    UseJoint efficiencyThickness limits
    Closing a hole: a removed opening or a cut-out corroded area (9.3.2)0.70at least 5 mm; at most the smaller of 13 mm and the adjacent nominal plate; overlap 25 mm to 8t; hole at least 50 mm
    Reinforcing a deteriorated plate, incl. below retirement thickness (9.3.3)0.35at most the perimeter thickness + the lesser of a third and 3 mm, and 13 mm; the plate under it not counted
    Small leaks or isolated pitting (9.3.4)0.35as 9.3.3, and at least 5 mm; the shell away from the pits meets tmin

    The thickness by design is the API 653 4.3.3.1 b) equation with the joint efficiency of the use: t = 4.9 H D G / (S E) (2.6 H D G / (S E) in US units), H from the lowest point of the patch to the maximum liquid level, S the smaller of 0.80 Y or 0.429 T in the bottom two courses and 0.88 Y or 0.472 T above, with Y = 205 MPa and T = 380 MPa when the material is unknown.

    048121602468101213.813 mm maximum (9.3.1.3)5 mm minimumsample at 12.0 m: 4.32 mmat 9.4 m: 10.6 mmheight of the lowest point of the patch above the bottom, m · thickness by design, mm— E 0.35 (9.3.3, 9.3.4)— E 0.70 (9.3.2)
    Thickness by design for the sample tank, S = 188.8 MPa.
    • The sample reinforcing patch at 12.0 m needs 4.32 mm; the 8 mm patch on 6.2 mm plate passes. Move it to 9.4 m on 6.5 mm plate and it needs 10.6 mm, but may be at most 8.67 mm: the tool says a lapped patch does not work there and points you to a replacement plate (9.2).
    • Only on a course of 13 mm (1/2 in.) or less as built (9.3.1.2), only when the owner/operator specifies it (9.3.1), and never to replace a door sheet or shell plate.
    • Size: at most 1.2 m (48 in.) high and 1.8 m (72 in.) wide, at least 100 mm (4 in.); corners rounded to 50 mm (2 in.) except at the shell-to-bottom joint (9.3.1.4, 9.3.1.7).
    • It may cross butt seams ground flush, overlapping at least 150 mm (6 in.) past them; never lap, riveted or other patch seams, distorted areas or unrepaired cracks; no opening inside it; Figure 9.1 spacing to other welds and patches (9.3.1.5, 9.3.1.8, 9.3.1.10). Inside the shell, 150 mm (6 in.) clear of the shell-to-bottom weld (9.3.1.6).

    New or replacement shell penetrations (9.9)

    StepRuleSample: NPS 16 at 0.75 m, 28 mm thickened insert
    Required shell thickness (9.9.2)4.3.3.1 b): 4.9 H D G / (S E), H from the centreline to the maximum level, S from API 650 Table 5.2 (138 MPa, 20,000 lbf/in.², if unknown), E 1.04.9 × 13.05 × 36 × 0.9 / 160 = 12.95 mm
    Required area (API 650 5.7.2.1)vertical hole dimension × that thickness412 × 12.95 = 5,335 mm²
    Stress relief (9.9.3, API 650 5.7.4)Group I – IIIA: NPS 12 and over in plate over 25 mm; Group IV – VI: over NPS 2 in plate over 13 mm. Group not confirmed: the Group IV – VI rulerequired: 28 mm Group I plate
    Insert plate (9.9.6)over NPS 4 in shell over 13 mm that does not meet the current design metal temperature: an insert at least the greater of 2 × the opening and the opening + 300 mm (12 in.)1,050 mm against 824 mm
    Major alteration (3.25 a)over NPS 12 below the design liquid levelyes
    • Nozzle Reinforcement does the full API 650 5.7 design: tick “use t_req” there, enter the thickness from this tool, and bring the area provided back here.
    • A penetration on a shell joint needs Purchaser acceptance and the joint radiographed for three times the opening diameter (9.9.5, API 650 5.7.3.4).

    Welded-on bottom patches (9.11.1)

    shell (inside face)critical zone, 75 mm (3.11)150 mm: tombstone shape inside this line≤ 6 mm thick≤ 600 mm along the shellunknown toughness: ≥ 75 mm or 5t to vertical shell weldsoutside the critical zone300 mm over a seam,else 150 mmlap seams crossed at 45° or more
    Figure 9.13 rules as the tool applies them.
    WhereRules
    AnywhereLeast dimension 300 mm (12 in.) over a seam or patch; smaller patches at least 150 mm (6 in.), not over seams or patches, and 50 mm (2 in.) past the corrosion. Corners rounded 50 mm. Edges parallel to seams or other lap welds 50 mm away. Over a three-plate lap: 300 mm along each lap weld and crossing at 45° or 90°; otherwise lap seams crossed at 45° or more, 100 mm (4 in.) from the next three-plate lap. Over a dent: span at most 300 mm, at least 6 mm (10 mm for Annex M) and the bottom thickness.
    Within 150 mm (6 in.) of the shellTombstone shape, sides square to the shell-to-bottom joint (9.11.1.2 b).
    In the critical zone, 75 mm (3 in.) from the shell (3.11)At most 6 mm (1/4 in.) thick; not over a patch or butt-welded to one; at most 600 mm (24 in.) along the shell; patches apart by half the shorter one; unknown toughness: 75 mm or 5t from vertical shell welds; operating at most 93 °C (200 °F) carbon steel, 38 °C (100 °F) stainless; bottom under the weld at least 2.5 mm (0.10 in.).
    • A patch thinner than the bottom is noted, not failed: 9.11.1.1 b) asks for the 4.4.5.1 calculation and owner approval.
    • The remaining bottom at the toe of the inside shell-to-bottom weld must still meet 4.4.5 and 4.4.6 at the next inspection (9.11.1.2.2): a record item, checked in Inspection Interval or Annular Plate Ring.

    Hot taps (9.15)

    CheckRecognized toughnessUnknown toughness
    Size and shell thicknessTable 9.1: NPS 6 and under 5 mm (3/16 in.); NPS 8 6 mm; 10 8 mm; 14 10 mm; 16 11 mm; 18 13 mm (1/2 in.). Between rows, the next larger size. Over NPS 18: outside the table.at most NPS 4
    Liquid above the tapat least 0.9 m (3 ft) during the work (9.15.1.2)and the hoop stress 4.9 H D G / t below 48 MPa (7000 lbf/in.²): for 8 mm shell on the sample tank, H at most 2.42 m
    Reinforcing platenot across seams or to the shell-to-bottom weld (9.15.1.7); 300 mm (12 in.) from vertical welds (Figure 9.14); API 650 Figure 5.6 to horizontal welds and the bottomalso at least the shell thickness and the cutout + 50 mm (2 in.) across
    Spacing to other nozzles√(R T) toe to toe (9.15.3.1)same
    • Four shell thickness readings around the location (9.15.3.2): the tool uses the least.
    • Sample: NPS 8 at 1.2 m in 20.6 mm shell; √(R T) = √(18,000 × 20.6) = 609 mm; nozzle pressure test before the machine goes on, at least 1.5 × the hydrostatic head = 167 kPa (9.15.5.3).
    • Where API 650 5.7.4 would call for stress relief, a hot tap is still allowed without it, but only with a controlled-deposition procedure (11.3.2) qualified with water backing (9.15.1.1). Not on the roof or in the vapour space, not on laminated or pitted plate, not where welding heat can cause caustic or stress corrosion cracking.

    Major repairs, radiographs and the hydrotest

    ResultWhere it goes next
    Major repair or alteration (3.25)A replacement plate or door sheet below the design liquid level longer than 300 mm (12 in.), or a penetration or hot tap over NPS 12 below it. The tool says yes or no; the Hydrostatic Test tool in its existing-tank mode decides the test or the 12.3.3 exemption.
    Radiograph countConstruction Checklists: API 653 Shell Radiograph Count (12.2.1) for the repair welds, and API 650 Shell Radiograph Count (8.1.2, Figure 8.1) for new-to-new joints.
    ExaminationsConstruction Checklists: API 653 Repair Examination Checklist (12.1, 12.4).

    Tank repair list: all items in one report

    A repair job on one tank usually has many items. Check and save each one with its own repair item reference (R-01, R-02 …), then press Load the repair list for this tank in the Tank Repair List card. The list shows the latest save of each reference; an earlier save of the same item is counted but left out, so a corrected check replaces the first one.

    The list adds upFrom
    Items with failing checks, and checks still needing inputeach item’s saved checks
    Hydrostatic test: required unless exempt under 12.3.3 when any item is a major repair or alteration (3.25)the major-repair result of plates, door sheets, penetrations and hot taps
    What to enter in the API 653 Shell Radiograph Count: circular plates, rectangular plates and door sheets, insert plates, and which go full length (its Fill the plate quantities from the tank repair list button reads the same items)plate shapes and thicknesses; penetrations in an insert
    Hot tap nozzle test pressures (9.15.5.3)each hot tap, in its own units
    Work record items confirmed and openeach item’s ticks
    • Untick an item to leave it out of the totals and the report; Open loads it into the page to change and save again.
    • Fill in the work order, contractor and inspector, then Print tank repair report: a cover page with the register, what the job needs and a sign-off block for the contractor, the authorized inspector or storage tank engineer, and the owner; then one page per item with its checks, rows, sketch and work record.
    • Each item is re-checked from its saved inputs, in the rule set it was saved in, when the report is made; the item you are working on is put back afterwards.
    • Nothing extra is saved: the list is read from the saved items, so it is always current.

    Filling from the other tools

    ToolWhat it gives
    Shell DesignD, design liquid level, G; at the height of the repair: the course, its thickness as designed, the thickness required and its allowable stress Sd
    Shell EvaluationD, maximum liquid level, G, riveted construction; at the height of the repair: the course t1 for the patch perimeter and the shell away from the pits (check it at the patch)
    • Enter the height of the repair first: the course values depend on it.
    • The latest record of each tool for the same company and Tank ID is used; the table under the button shows what was filled.

    The checks

    RepairClauses checked
    Replacement plate, door sheet9.2.1, 9.2.2.1, Figure 9.1, 9.2.3.3, 9.2.4.4 – 9.2.4.9, 12.2.1.6, 3.25 c
    Lapped patch9.3.1.2 – 9.3.1.10, 9.3.2.1 – 9.3.2.4, 9.3.3.1 – 9.3.3.2, 9.3.4.1 – 9.3.4.3
    Penetration9.9.2, 9.9.3 with API 650 5.7.4, 9.9.5, 9.9.6, 3.25 a
    Bottom patch9.11.1.1 a – e, i – l; 9.11.1.2 a – j; 9.11.1.2.3
    Hot tap9.15.1.1 a, b; 9.15.1.2; 9.15.1.4; 9.15.1.7; 9.15.3.1; Figure 9.14 with API 650 5.7.3; 9.15.5.3
    AllWork record: 9.1.3 – 9.1.7 and the Section 9 and 12 items for the repair

    How the numbers were checked

    • Figure 9.1 was read from the published table for both columns and both unit sets; the test suite checks R, B, H, V, A and C at 10, 22, 30 and 40 mm and at 7/8 in.
    • Each sample is recomputed by hand in the tests and in this manual’s build: the lapped patch thickness, the 9.9.2 thickness and area, √(R T), the test pressure and the unknown-toughness liquid limit.
    • Every check was made to fail in turn, in SI and in US units: 89 tests, plus 25 for the tank repair list (latest save per item, totals, the combined report, and the page put back afterwards).

    Saving, reopening and reports

    • Inputs are kept on this device as you type and offered back if the page closes; Calculate & Save stores one record per repair item; Show saved checks lists them with their type and whether they are major.
    • Print / PDF report: the summary, the rows and sketch for the repair, the work record and the inputs.
    • Open the tool on a type with a link: repair-design-checker.html?type=htap (also plate, door, lap, pen, bpatch).

    Limits and interpretations

    • Nonmetallic repairs (9.4, Annex J), shell height changes (9.6), fixed and floating roof repairs (9.12 – 9.14) and complete new bottoms (9.11.2) are not checked.
    • The lapped patch design uses the 4.3.3.1 b) hoop equation with the joint efficiency of 9.3. API 653 gives no equation for a patch over a hole carrying the pressure across it (9.3.4.2); for a large hole check plate bending too.
    • For a penetration the tool finds the required thickness and area; the reinforcement and API 650 5.7.3 weld spacing are designed in Nozzle Reinforcement.
    • Figure 9.1: the heavier column applies if either the replacement or the existing plate is over 13 mm (1/2 in.), following 9.2.3.3.
    • Table 9.1 between rows: the next larger connection size. Hot tap spacing to horizontal welds and the bottom uses API 650 Figure 5.6 for an as-welded opening, as Figure 9.14 refers to.
    • The tank repair list reads the saved items; an item not saved, or saved without a repair item reference, appears as its own line.
    • Critical-zone rules apply when the patch comes within 75 mm (3 in.) of the shell; the tombstone rule within 150 mm (6 in.).

    Glossary

    Recognized / unknown toughnessSection 3: plate shown to meet the toughness rules, or not.
    Critical zoneThe bottom or annular plate within 75 mm (3 in.) of the inside of the shell (3.11).
    Door sheetA plate cut from the shell for temporary access and put back or replaced (3.13).
    Major repair / alterationWork listed in 3.25 that triggers the hydrostatic test unless exempt (12.3).
    Toe to toeDistance between the edges of two welds, as Section 9 measures spacing.
    √(R T)Hot tap spacing: shell radius times shell thickness, square-rooted.